Installation works at production line

Published: 8 February 2022
  • offloading and internal relocation and installation of the equipment
  • installation of a new quality control station and strapper 
  • strappers relocation to the new location 
  • design and fabrication of transporters control cabinet
  • the project was realised from January to September 2021